Stakeholder Liaison

Challenges with interventions that identify Stakeholders

Construction of West End Link (WEL)

Goal of Intervention Potential Interventions Reference Stakeholders
WEL to be a major part of the road layout options for Witney Consider the shortlist of layout options produced by OCC Project Planning Team and confirm support for their preferred option. WEL01 OCC
WODC
WTC
Choose the best form of construction for the WEL Review the case for and against a viaduct structure WEL02 OCC
EA
Review the case for and against an earth dam WEL03 OCC
EA
WOMAFG
Maximise the use of the WEL to add to community infrastructure Provision of pedestrian routes and cycle tracks that will contribute to active living targets in the Local Plan. WEL04 OCC
WODC
Improvement in bus services using bus lanes to encourage greater use of public transport. WEL05 OCC
WODC
Benefits in reduction of traffic congestion and air pollution. WEL06 OCC
WODC
Consider the potential for tree and shrub planting within Witney. WEL07 OCC
WODC
WEL must form part of the Witney Perimeter Road system Reinforce the need to complete the perimeter roads around Witney (WEL, NDR and Shores Green slip-roads are the only outstanding elements) WEL08 OCC
WODC

Construction of Northern Distributor Road (NDR)

Goal of Intervention Potential Interventions Reference Stakeholders
Construct the NDR to complete the planned perimeter roads around Witney WEL to be a major part of the road layout options for Witney NDR01 OCC
WODC
Ensure access between neighbouring communities and Witney town centre is maintained NDR02 OCC
WODC
Urge OCC to complete options studies for
  • NDR alignment and road geometry
  • Junction design at both ends of the NDR
NDR03 OCC

Flood Prevention Measures through the Windrush Valley

Goal of Intervention Potential Interventions Reference Stakeholders
A fully comprehensive hydraulic model on which to base flood predictions is required Update 2014 Hydraulic flood model ensuring all main tributaries through Witney are included. FLD01 EA
OCC
WODC
Reduce flood risk Downstream Bridge street Look at improving flows through Langel Common footpath to ensure flood plain connectivity is improved during all flood events. FLD02 EA
OCC
WODC
Investigate if the perimeter ditch of the Aquarius site can be modified/ diverted to increase flow capacity. FLD03 EA
OCC
WODC
Investigate if the river could be modified to increase flow capacity during severe conditions, especially between New Bridge Street through to the footpath in Langel Common. FLD04 EA
OCC
WODC
WTC
Dredge the river channel at Bridge Street bridge to maximise the flow capacity. FLD05 EA
WODC
Reduce flood risk Upstream Bridge Street Retain Windrush flood water in the flood plain by constructing the WEL on an earth dam. FLD06 EA
OCC
WODC
Divert surface water flow from Hailey village via Milking Lane and then in open streams and ponds through Foxburrow Wood to reach outfall into the Windrush in the flood plain upstream of the WEL. FLD07 EA
OCC
WODC
WFT
Ensure the inclusion of attenuation ponds in North Witney housing development. FLD08 EA
OCC
WODC

Community Infrastructure provided from the North Witney Housing Scheme

Goal of Intervention Potential Interventions Reference Stakeholders
Ensure that community infrastructure proposed in the North Witney housing development fully meets the needs of the community Ensure there are suitable community facilities where people can meet up and socialise COM01 OCC
WODC
Ensure there are adequate sports pitches and supporting changing facilities COM02 OCC
WODC
Investigate the suitability for locating proper burial grounds COM03 OCC
WODC

Stakeholders

Abbreviation Full title
EA Environment Agency
OCC Oxfordshire County Council
WFT Wychwood Forest Trust
WODC West Oxfordshire District Council
WOMAFG West Oxfordshire Multi Agency Flood Group
WTC Witney Town Council